fischer fixing systems

03/04/2026

Getting the most out of wood

Wood is in demand worldwide – whether in prefabricated housing or multi-storey residential construction. Hardly any other building material combines climate neutrality, outstanding building-physics properties, a healthy indoor climate and natural aesthetics as convincingly as this renewable resource. At the same time, wood enables a high degree of prefabrication and fast installation. Versatile and high-performance fischer structural timber screws make it possible to get the most out of wood – with outstanding safety, efficiency and application versatility.

More information
02/24/2026

Sun on top, secure underneath: systems for PV installations

Whether small residential systems or large-scale industrial installations – fischer solar systems offer suitable fastening solutions for pitched roofs with various roof coverings as well as for different layouts and orientations of PV modules. New possibilities for energy-generating façades are also opened up by the innovative PV clip system, including the sliding nut FSMN II M8 R.

More information
02/19/2026

Solar power from balcony

The mini PV system has been delivered, the box opened, and anticipation is high. But then comes the crucial question: "How do I attach the balcony power plant securely so that it stays firmly in place even during the next autumn storm?" The good news is that, with a few simple tricks, installation is easier than expected. By following a few basic rules, the balcony power plant can be installed quickly, safely, and permanently – providing clean electricity right outside the balcony door.

More information
02/18/2026

fischer overcomes challenges posed by the Venetian Lagoon

fischer’s UltraCut FBS II stainless steel concrete screws and FIS EM Plus injection mortar ensure stable connec-tions and efficient installation at the ACTV landing stage ‘San Zaccaria Danieli’ in the Italian city of Venice.

More information
02/10/2026

Solid anchoring on Earth for new views into space

With a primary mirror diameter of 39 m, the world’s largest optical and near‑infrared telescope is being built on Cerro Armazones in Chile – the Extremely Large Telescope (ELT). This groundbreaking project of the European Southern Observatory (ESO) will allow unprecedented insights into the depths of the Universe. Fastening and system solutions, together with accompanying engineer-ing and BIM services from fischer, ensure the safe and efficient installation of the piping systems of the building services (MEP).

More information
More results
Seen 35 of 333 result (s)
cd-green-6548874db8-z2wg6