10/16/2017

Elevated technology

It towers above every other building in Baden-Württemberg and contains Germany’s highest observa-tion deck: the elevator test tower of thyssenkrupp Elevator AG in the Swabian town of Rottweil. A 17,000 m² envelope made of a polymer-coated glass fibre fabric spirals its way around the main body, serving as the facade’s cladding. Heavy-duty fixings by fischer were used to anchor this membrane. The lantern gear rails of the installation shuttle were also partially anchored with fischer systems. A total of approximately 22,000 fischer products were used on the project.

More information
10/10/2017

fischer fixings expand the French capital

„Le Grand Paris” – is a project creating space in Paris, Europe’s most densely populated city. The project is uniting the capital with multiple neighbouring communities – not only territorially, but also through administration, city planning and new living spaces. The expansion of the public transport network is creating good connections. The existing route 14 has been expanded by six kilometres and five new stations. fischer steel anchors were used to securely fix the power lines.

More information
06/27/2017

Group of companies wins “Stein im Brett” award

During a survey throughout Germany, the construction information service ibau asked over 3,000 workshops who the best manufacturers and brands in the construction industry are. fischer came first place ahead of Hilti and Würth for the “fixing technology” product category, thereby winning the “Stein im Brett” award in its first year.

More information
04/24/2017

fischer shines in New York’s Times Square

Times Square in New York is one of the world’s most visited sites, with approximately 30 million tourists per year. The fischer group of companies presented itself on one of the world’s largest digital advertising spaces where Broadway and Seventh Avenue meet.

More information
03/13/2017

Flexible supply system

The fischer installation grid is the flexible solution for the safe, neat and optically-convincing laying of pipe, data and supply lines in production buildings. The system allows more freedom of design and flexibility throughout the building’s entire operating life. The modular set up saves time and costs during assembly, while refitting production plants or while reutilizing spaces or buildings.

More information
More results
Seen 260 of 277 result (s)
cd-blue-7dc6bcccf-z5t2n